Toolbox Tips (All)
Nov 18, 2024
Set Constant Temperatures for Paving Success
While snow is already flying in some parts of North America, ambient temperatures are still right for paving and finishing up the season in other parts. There are some mix […]
Nov 11, 2024
Get Material Delivered, Placed Timely
At any time of year, you must monitor haul truck timing and mix delivery. Right now, that timing takes on new importance with cold weather setting in around most of […]
Nov 03, 2024
Use Caution from the Outset of Pavement Repairs
It’s the time of year in most parts of North America where pavement repairs are probably due to utility problems that have required some fixing. No matter what portion of […]
Oct 30, 2024
How to Charge the Hopper
One of the basics for asphalt paving is getting the mix from the haul truck to the paver’s hopper, which is referred to as “charging the hopper.” It takes a […]
Oct 29, 2024
Winter Shutdown Is Prime Time for Hot Oil Heater Maintenance
As production slows and you ready your plant for winter shutdown, now is the ideal time to think about removing any sludge buildup and replacing the heat transfer fluid in […]
Oct 29, 2024
Train Drivers to Watch Where They’re Going
To prevent accidents on job sites, it is crucial to enforce clearly defined roles for drivers and ground personnel, utilize safety equipment like proximity alarms and whistles, and foster accountability through safety buddy systems, as illustrated by a near-miss incident involving a distracted driver and parked vehicles.
