Nov 27, 2021
Perpetual Pavement Award winner SR 210/Ross Clark Circle has gained just 3.3 inches of pavement in 63 years of service.
Aug 23, 2021
When Waste Management wanted to upgrade a gravel lot at its facility in Springdale, Arkansas, Pavecon stepped in to suggest stabilization and a new asphalt surface course. This saved WM 27 percent of what it would have paid to reclaim the existing lot!
Oct 26, 2020
WisDOT paves a side-by-side long-term performance comparison on cold in-place recycling and pulverize and relay methods on STH-49.
Feb 25, 2020
Koss Construction has performed Oklahoma’s second Perpetual Pavement project with full depth asphalt, located on US-69.
Dec 27, 2019
Construction headsets can improve communication, training and safety while protecting against hearing loss.
Sep 25, 2019
How to perform a full depth reclamation, following industry best practices
Apr 25, 2019
Don’t let poor base or soil quality affect the quality of your asphalt mat! AsphaltPro outlines the best practices of how to perform base stabilization.