Toolbox Tips (All)
Oct 12, 2026
Drag Slat Conveyor Checklist for Winter Maintenance
Use this drag slat conveyor maintenance checklist to inspect bearings, floor liners, oil and sprockets during winter downtime.
Oct 05, 2026
Set Your Nozzles to Influence Direction of Spray
Proper distributor spray nozzle alignment helps crews achieve uniform, accurate application rates for tack, emulsions, sealcoats and other asphaltic materials.
Sep 28, 2026
Dose Your RAP According to Recommendations
Learn how to identify and dose recycling agents in high-RAP mixes while keeping total binder content consistent from lab design through plant production.
Sep 21, 2026
Pavement Maintenance and Preservation Detail: Prep Your Sealcoat Material
Learn how to mix sealcoat sealer and sand at the proper ratios and agitation speeds to maintain suspension, friction properties and consistent application.
Aug 31, 2026
Time the Chip Seal for Proper Seating
Proper chip seal timing helps crews achieve aggregate embedment by coordinating emulsion temperature, rolling and brooming before opening the roadway to traffic.
Aug 24, 2026
Double-Check Paving Measurements Before You Start
Double-check asphalt paving measurements, including tonnage, screed width, depth and slope, before paving to help the crew stay on target and protect pay.