Nov 24, 2020
South Carolina’s First FDR Makes Royal Rehab
A Wirtgen recycling train rehabilitated a depth of 20 centimeters in a single pass on South Carolina’s Highway 123 in the DOT’s first FDR project.
Nov 24, 2020
A Wirtgen recycling train rehabilitated a depth of 20 centimeters in a single pass on South Carolina’s Highway 123 in the DOT’s first FDR project.
Sep 22, 2020
Contractors can take advantage of the process known as cryogenic hardening for any number of tools. Let’s take a look at why a pavement maintenance contractor would do such a thing and what value it offers.
Jul 22, 2020
Bergkamp Inc. acquisition of Benedict Slurry Seal positions lab equipment for preservation professionals
Jun 22, 2020
Anrak milled the damaged rolled concrete surface of the steeply inclined Lake Oroville dam ahead of repairs.
May 22, 2020
Rabine Paving trialed a pavement quality indicator (PQI) Model 380 from TransTech Systems Inc. They soon ordered three of the non-nuclear density measuring devices.
Apr 21, 2020
Riverside Asphalt provides tack coat services for the larger paving contractors in Eastern Massachusetts and Southern New Hampshire, using a fleet of distributor tanks from E.D. Etnyre, Oregon, Illinois.
Feb 25, 2020
For Innovative Roadway Solutions—a pavement preservation specialist operating in Texas, Missouri and the surrounding states—success means taking advantage of new innovations, even if they present a challenge to current pavement maintenance processes.
Jan 25, 2020
Continental Milling Inc. uses a Cat® PM822 cold planer for Kiewit Corporation’s Pikes Peak mill and overlay.